Wednesday, September 18, 2013
Tuesday, September 10, 2013
Jeep is turning 1 and promptly in the shop...
So our 2013 grand cherokee, pretty much turned 1 year old with 12k miles and the check engine light goes on and off to the dealer it goes to get it fixed.
What do we get as a loaner? A small little chrysler c200 convertible, which is a bit limiting for my frame and kinda tight. But it's nice to have a convertible to take advantage of the sunny days right now and to demo, if we really want to buy a convertible as next car.
But it definitely does not compare to the porsche 987s boxster with test drove for my 30ths birthday.
Sunday, September 01, 2013
we got a couch and now we need end tables
recently we got our new couch and this basically means that we now need some end tables for it, since our existing ones neither match or look that great and they are getting a bit old.
At the same time our finacial situation also improved a little bit, which gave me the opportunity to buy some nice wood and build them myself. Since mahogany is quite expensive, we decide to build a small side table first. And if all works out, we will create a big one afterwards. If not we just buy some cheap poplar and stain it mahogany colored...
![]() |
| 69$ of wood, it's not a lot, but enough for a single end table, which sells for the mid to high 300$ |
![]() |
| everything cut to size, sadly not precise 90 degree angles, since I still don't have a jointer |
![]() |
| shaping the legs, I want that they all have a slopped angle 2" from the top |
![]() |
| about 3/4 of an inch to remove with my fore plane, while trying to keep the correct slope |
![]() |
| after roughing out the shape with the bandsaw, it time to finetune it with the rasps. |
![]() |
| about 70% complete, just need to add the bottom shelf, sand it and apply a french finish. |
![]() |
| time to cleanup the mess |
Thursday, August 29, 2013
Back from camping and finally we got a couch...
Two weekends ago we took our little summer trip and went camping for a couple of days. Nothing big, just 3 days of relaxing and doing nothing, but reading 'The legend of Drizzt' or in other words, the Forgotten Realms series, which spanned several of my favorite computer games of all times. I'm actually playing baldurs gate again, when I can't sleep. But this is another topic all together.
![]() |
| the area around Black Butte Lake |
![]() |
| making some dinner |
![]() |
| our little family, just being happy |
Speaking off, we finally managed to decide on a couch for the living room and now just need a fitting table or ottoman to go with it.
Also we finally have an entertainment center, which turned out to be a compromise between buying one and me reinforcing the frame and cutting it out to support the weight of our system.
![]() |
| first couch I bought in my live... |
![]() |
| wide angle lenses make our house look huge... |
Sunday, August 04, 2013
Waiting for gras to grow...
after we finished tilling, leveling and seeding our right side of the lawn, we are now literally waiting for grass to grow. It should be all nice in green in 6-8 weeks from now.
So now we are focussing on the left side and improving the look of our planters.
![]() |
| slowly adding red mulch to the planters, to improve their look |
We are also making progress with our little vegetable garden and hope to harvest some more things soon.
![]() |
| bell peppers are finally showing up |
![]() |
| so do the cayennetta peppers |
![]() |
| as our tomatoes. Well frankly we going to have hundreds of tomatoes in 3-4 weeks. |
Saturday, July 20, 2013
next step done...
Wednesday, July 17, 2013
the dogs are getting older, maybe calmer?
now that the dogs are getting a bit older and start to listen, sometimes even successfully we decided it's time to replace the sad excuse for 'grass' with a new coat of grass.
Little did I know how much work this is going to entail. And so this is the first step in my thirteen step program, at least it feels like it.
tilling the right side of the yard (next year we do the left, yay...)
![]() |
| step 1 - tilling the yard |
it was only 102F/38C this day, so not to bad for living around the central valley.
next step would be to till it all over again and again and than flatten it...
Saturday, July 13, 2013
our little house - it's starting to come together
Well over the last weeks we are finally starting to making progress with our backyard improvement project and creating a little suburban live-style vegetable garden.
![]() |
| newly installed fence next to our wild roses and heirloom tomatoes |
![]() |
| the worlds smallest orange tree. Hopefully in 3-5 years it's going to bear some fruits. |
![]() |
| bell pepper, zucchini and half dead sun gold tomatoes. Still have to build 3 more boxes for artichokes and arugula in the winter time |
![]() |
| basil, chives, mint, oregano, stevia. Need another barrel for rosemary, tarragon and sage. |
![]() |
| finished restoring a Stanley #6c hand plane from the late 1940s. Need to find some 3x3x3 maple to redo the knob to make it match my carved tote a bit better. |
![]() |
| rasberries a week ago, sadly they did not survive the 120F days we had and we might have to replace the canes |
![]() |
| don't pay attention for a minute and the puppies are taking over the bed... I guess this is another lost cause. |
Thursday, July 11, 2013
talking for a good cause...
recently my friend Kristen joined the organisation, 'Girls who code' and started teaching these kids the basic about programming, robotics and microchip programming.
To my surprise she invited me as a speaker to 'share my wisdom' of developing for close to 20 years to tell these girls what they have to be aware off with software development and where the use usual challenges and problems are.
Needless to say I hate a lot of fun talking to these extremely bright and smart kids, who obviously have a huge potential and wouldn't mind working with some of them some day in the future.
I might even apply to become a teacher for a summer there next years, since I had way to much fun and they even play with arduinos (can't wait till the next 5 I ordered arrived to automate my veggie garden...) !!!
Sunday, June 09, 2013
camping
Since we all work a bit much, we needed to get a way a bit and drove up north to fort bragg to camp a little bit.
![]() |
| Surrounded by several 600-800lb's elks. Needless to say the pups were upset |
![]() |
| basil bee is watching over our tent |
progress on the restauration...
Tuesday, May 21, 2013
restoring antique tools
![]() |
| The little plane was feeling lonely.. |
![]() |
| so during a visit to an antique store I picked up some bigger plans. A No.3, 2xNo.5 and No.6 handplane, which need a lot of work to shine again, since they are about 50-100 years old |
![]() |
| using electrolysis to remove the rust from the first cap iron and polishing it a bit. |
![]() |
| since all the handles are broken/ugly it is time to use a couple of rasps and carve/file new ones from mahogany. |
![]() |
| first handle is done, now we need to do 4 more and also 4 knobs. |
Sunday, May 05, 2013
Building a vise...
Since I still don't have a woodworking vise, I put it into my mind to just build one, from some wood I had laying around.
![]() |
| My tiny plane is a bit small to smooth about 36" inches wide jaws, after prepping them with my 15$ Jackplane |
![]() |
| Slowly getting better with using a handsaw. Still long ways to gogo to get it perfect |
![]() |
| But sadly the stupid oak split after assembly, so it' yet again back to the drawing board |
Wednesday, April 24, 2013
bah... let's go back to the drawing board...
so after glueing everything up for the last 48 hours, it turned out that there is some oddity and my joints are not tight enough. Which cause the shelf to break appart :(
Time for the 2nd try, to see if we can get it working this time and use this one as a model how not todo it...
Saturday, April 20, 2013
starting with the glue-up of the stereo rack
Over the last couple of weeks I got so carried away with all these projects, which are going on that I slightly neglected my stereo shelf project and now finally found some time to work on it again.
It's basically the moment of truth now, were everything needs to be glued up and prepared for finishing it.
So this weekend I'm starting to glue the pieces together, after dry fitting everything again and to check that everything is somewhat square. Surprisingly enough, nearly everything seems to fit and is pretty square. Not perfect 90 degrees, but about 88-90 degrees mostly.
![]() |
| first side in clamps and wooden supports. |
Speaking of finish?
The current idea is to have a couple of orange shellac coats over and than stain the sections dark mahogany and the boards for the components a light cherry.
Now I mentioned other projects.
1.
We basically finally bought a hedge-trimmer and so I'm busy trimming all our hedges and trees. Sadly it can only cut 5/8th of an Inch, so I'm still stuck with using my 15$ crosscut handsaw to cut branches.
2.
we started taking out all the tiny and medium sized palm tree, which means Robin is digging a lot and I'm practicing with Axed and Machete quite a bit. It works, but it's slow going. Still refusing to buy a chainsaw.
3.
My neighbor cut down an old peach tree, so I rescued a couple of logs of peach. To cut them into boards on the bandsaw. Well free wood is never really free wood. Since so far I'm at -30$ for a broken bandsaw blade and the wood is to tough to be cut with my 1 1/2 hp bandsaw. Guess I have to build another plywood sled
4.
My little company is picking up right now a bit and so I have quite a lot of work todo in my spare time.
5.
we need to get started with replacing some Fence section, hence the additional income is right now really really helpful. Since fencing get pricey quite fast. But hey I get my first door to build and arbor. Since we hope to have some tomatos or so growing on it.
Something like this
| without the flames obviously... |
Wednesday, April 10, 2013
2 years are up time to upgrade the pc at home
Recently I noticed that my system is getting rather old and is becoming a touch slow for my software development needs and so it was time to upgrade a couple of components. Mostly the harddrives were exchanged for a couple of SSD's and my pair of 6950 graphic cards for a pair of 7970 graphic cards. After all the LCD displays like to be driven at full resolution and I do have the vise of playing to much skyrim and sim city. And my old cards did get a bit slow for my liking at 2500x1600.
Which I was not really prepared for was that I needed...
- a new case for more harddrives, since my VMWare images are now in the Terra-byt region
- a ridiculous 1200 Watt power supply, since my 750W is highly overloaded with running all the hardrives and graphic cards. I don't think it's good, if It keeps running at 820W. So for now disabled some harddrives again und drop the CPU to 3.2 GHz instead of 4.5GHz.
- how big 2x7970 graphic cards are, running each at 1GHz and having each 3GB Ram. This is combined more Ram than Robins and My laptop have together...
Monday, March 11, 2013
Rough finish of the legs
so I'm finally at the point, were all the leg's for the stereo rack are glued together and cut to size.
![]() |
| all the leg's ready |
![]() |
| pairing the mortises and tenons for the main shelf |
![]() |
| they are about 1cm or 1/2" thick and the main cutting board is 1" |
But after a lot of different tests and playing around I finally got them to work and holdup.
![]() |
| I really want to make some for myself right now |















































